On Enterprise

+91 94101 60972 | HQ: Kundarki, Moradabad, UP
Solar Energy
Clean Energy Solutions

Solar Energy

Scale Solar Infrastructure With Precision & Reliability.

On Enterprise delivers end-to-end solar engineering, certified rooftop deployment, and 24/7 localized support engineered for domestic and commercial scale.

Tier-1 Efficiency

High-output Mono PERC & TOPCon solar technology.

25-Year Warranty

Guaranteed linear power output and durability.

Subsidy Support

Direct assistance with state & national rooftop grants.

Fast Rooftop Setup

Site inspection and installation within 48 to 72 hours.

Direct Doorstep Solar Survey Active Across:

Moradabad Kundarki Bilari Sambhal Chandausi Rampur Bareilly
Solar Rooftop Installation On Enterprise

Engineered For Maximum Solar Output.

Customized rooftop configurations designed for continuous power generation across Moradabad, Kundarki, Bilari, Sambhal and surrounding UP regions.

High-Efficiency Mono Cells

Up to 22.5% module efficiency delivering power even in low-light conditions.

25-Year Performance Backing

Linear power degradation protection guaranteed for 25 operational years.

Discom & Subsidy Handled

End-to-end net-metering approvals and rooftop subsidy paperwork included.

How Rooftop Solar Works In 4 Simple Steps.

From your first doorstep rooftop survey to official net-meter installation and government subsidy release in your bank account.

STEP 01

Doorstep Rooftop Survey

Our certified engineers visit your site in Moradabad, Kundarki, Bilari, or nearby areas to analyze sunlight angles, shadow-free space, and structure stability.

Within 24-48 Hours
STEP 02

CAD Design & Subsidy Filing

We calculate your customized capacity (2 kW to 10 kW) and prepare official registration papers for the PM Surya Ghar national subsidy portal.

100% Paperwork Handled
STEP 03

Mounting & Wiring

Heavy-duty galvanized mounting structures, tier-1 TOPCon panels, and smart inverter installation executed with storm-resistant standards.

25-Year Warranty Mounts
STEP 04

Net-Meter & Power On

UP Discom connects the bidirectional meter. Extra power feeds the grid, electricity bills drop to zero, and subsidy is released directly to your account.

Zero Electric Bill

Ready to inspect your rooftop feasibility?

Book a certified technician visit across Moradabad, Kundarki, Bilari, Sambhal, Rampur & Bareilly.

Real Field Deployments

Precision Engineering. Zero Compromise.

Actual rooftop setups deployed across Moradabad, Kundarki, Bilari & Sambhal.

Residential Solar Rooftop Plant

Residential Rooftop Architecture

3 kW to 10 kW On-Grid Systems

Zero Bills
Commercial Factory Solar Grid

Industrial & Commercial Arrays

High-Yield TOPCon Bifacial Panels

Heavy Duty

Frequently Asked Questions.

Everything you need to know about rooftop solar, government subsidies, and installation across Western UP.

How much government subsidy is available under PM Surya Ghar Yojana in UP?

Under the national PM Surya Ghar Muft Bijli Yojana, residential homes receive up to ₹30,000 for 1 kW, ₹60,000 for 2 kW, and up to ₹78,000 for 3 kW and higher systems. On Enterprise handles 100% of the portal registration, technical feasibility approval, and direct bank account subsidy processing.

Which cities in Uttar Pradesh do you provide doorstep site surveys for?

Our certified solar engineers provide direct doorstep rooftop surveys within 24 to 48 hours across Moradabad, Kundarki, Bilari, Sambhal, Chandausi, Rampur, Bareilly, and adjoining rural & industrial areas in Western Uttar Pradesh.

How does Net-Metering work with UP Discom (PVVNL / Madhyanchal)?

With a bidirectional net-meter installed, the excess electricity your solar panels produce during the day is sent back to the grid. In return, your electricity bill is credited unit-for-unit. At the end of the billing cycle, you only pay for the net electricity consumed.

What warranties and lifespan can I expect from On Enterprise solar setups?

All our Mono PERC and TOPCon panels carry a 25-year linear performance warranty (ensuring over 80% output even at year 25). Solar inverters and lithium storage batteries come with standard 5 to 10-year manufacturer replacement warranties.

How much rooftop area is required for a 3 kW or 5 kW solar plant?

As a rule of thumb, you need approximately 100 square feet of shadow-free rooftop space per kilowatt. Therefore, a 3 kW residential setup requires roughly 250–300 sq. ft., while a 5 kW plant requires 450–500 sq. ft.

Scroll to Top