PM Surya Ghar: Muft Bijli Yojana Liaison.
Complete institutional liaison with UP Discom (PVVNL & Madhyanchal) for national portal registration, site inspection, and direct bank account DBT subsidy disbursal.
Official Central Subsidy Structure (Direct Bank Transfer)
Governed by Ministry of New and Renewable Energy (MNRE) guidelines for residential rooftops.
| Solar Plant Capacity | Central Subsidy (DBT) | Suitable Rooftop Area | Avg. Monthly Savings |
|---|---|---|---|
| 1 kW System | ₹30,000 Direct | Approx. 100 Sq. Ft. | ₹1,200 – ₹1,500 |
| 2 kW System | ₹60,000 Direct | Approx. 200 Sq. Ft. | ₹2,500 – ₹3,000 |
| 3 kW & Higher | ₹78,000 Direct (Max Cap) | 300+ Sq. Ft. | ₹4,000 – ₹6,000+ |
Paperwork Handled by On Enterprise
-
UP Discom Consumer ID: Latest electricity bill verification for sanctioned load matching.
-
National Portal Registration: Upload of property records, Aadhaar, and technical system specifications.
-
Net-Meter Testing: Official lab testing and seal verification for the bi-directional meter.
-
Bank Passbook Linking: Ensuring direct transfer of ₹78,000 subsidy without middlemen.
The 4-Stage Disbursal Pipeline
Track your approval from application filing to bank account credit.
Portal Application
Filing of site survey documentation and rooftop photos on the National Portal.
Discom Feasibility
Technical feasibility approval issued by local UP electricity division engineers.
Meter Installation
Replacement of existing single-phase/three-phase meter with a bi-directional unit.
Bank DBT Credit
Inspection sign-off leads to direct central subsidy release into your linked account.
Have questions regarding your electricity bill eligibility?
Our dedicated liaison officers in Kundarki & Moradabad are ready to assist.